« Previous Page

LEPORT SCHOOL

San Francisco, CA

LePort Schools hired BCCI as general contractor to provide seismic upgrades, structural steel reinforcement, historic renovation and tenant improvements. Built in 1931, this L-shaped property consists of 10 classrooms, two infant care areas, secure-access playground, reception and a staff break area spread across a four-story North Wing and a two-story East Wing. In renovating a historic structures property, BCCI worked through numerous hearings with City agencies. Existing historical wrought iron balconies and fences at the building exterior were removed and rebuilt to match their original condition. Three new storefront-style entrances that replicate the historic entries were installed, and asbestos material was fully removed. The exterior courtyard work includes the removal of existing contaminated soils, two new large ADA-compliant ramps – one with glass guardrails, new exterior lighting and a fully landscaped courtyard including a play mound with slide, planting areas and play equipment. BCCI abated lead paint on metal windows and masonry walls using a local spot removal process and by containment through encapsulation.

Architect: Ware Malcomb
Project Size: 23,600 sf
Date Completed: December 2014