Skip to main content
Back to Top

BUILD RIGHT

Our clients trust us to bring their visions to reality. The right way, right on time.

CULTURE

2021 Best Places to Work in the Bay Area: BCCI Construction

BCCI Construction has been voted a Best Place to Work in the Bay Area by our employees over a dozen times. The single ingredient that sets us apart is our people. With a culture defined by high employee engagement, transparency, and teamwork, we make work fun and deliver exceptional projects for our clients.

Duration: 0:31 mins
PROJECT

Case Study: Google Account | SF Bay Area

BCCI has successfully completed over 2 million square feet of high profile projects for Google which has informed and enriched our understanding of Google’s company culture, environmental priorities and sustainability initiatives, as well as, expectations during project planning, construction, and closeout. BCCI’s team has worked diligently to ensure that all projects comply with Portico, Google’s Healthy Materials Program and achieve the desired LEED certification.

Duration: 03:01
PROJECT

Case Study: 345 Montgomery Building Repositioning | San Francisco

BCCI completed a renovation and seismic upgrade of the granite and glass cube at the corner of Montgomery and California Street – an iconic structure that was once Bank of America’s flagship retail location next door to its World Headquarters. The property, now owned by Vornado Realty Trust, has been transformed into a dramatic commercial office building with a five-story, 50’x50’ atrium; a stadium-style staircase from the basement to the first floor; cantilevered stairs; two new elevators; and all new mechanical, electrical, plumbing, and fire sprinkler systems.

Duration: 01:31
PROJECT

Case Study: Professional Service Firm | San Francisco

For more than a decade, BCCI has been a valuable construction partner for this global professional service firm’s Bay Area offices which led to the award of their latest build-out spanning five floors at Salesforce Tower. As a flagship innovation hub for the company, a creative, future-forward workspace was envisioned for the firm’s technology, digital business, and consulting operations to inspire new ways to work with clients and improve customer experiences.

Duration: 03:01
PROJECT

Case Study: 826 Valencia | San Francisco

BCCI completed the build-out of the new Tenderloin Center, a writing/tutoring lab with a retail store for 826 Valencia, a nonprofit dedicated to helping children ages six to eighteen develop their writing skills. BCCI donated its labor and fees to support the project and spearheaded an outreach program with the local subcontractor community.

Duration: 02:37
PROJECT

Case Study: 85 Bluxome | San Francisco

BCCI has completed construction on a new ground up office building in the South of Market neighborhood. Hired by developer Presidio Bay Ventures, BCCI provided feasibility analysis for improving the existing structure, a 27,646 square foot industrial building, versus demolishing the building and constructing a new one. Ultimately it was decided that the best return on investment was to build a new five-story shell structure totaling 56,850 square feet. BCCI assisted the design team with value analysis, programming, entitlements, city planning review, permitting, and material selection.

Duration: 01:40
PROJECT

85 Bluxome: Breaking Ground

BCCI Construction has broken ground on a new office building in the South of Market district. Hired by developer Bluxome Partners, BCCI provided feasibility analysis to improve the existing structure, a 27,646 square foot industrial building, versus demolishing the building and constructing a new one. Ultimately it was decided that the best return on investment was to build a new five-story shell structure totaling over 55,000 sf.

Duration: 1:38 mins
PROJECT

Case Study: The Battery | San Francisco

BCCI completed a major structural renovation of the Musto Building. Originally constructed in 1907, the unreinforced masonry structure required a mandatory seismic upgrade and included restoration and retrofit work, an expansion of the basement level, and the addition of a fourth floor penthouse. The building which was once used as a warehouse and then office suites has been converted into swanky private social club The Battery with a fine dining restaurant, four bars, a wine cellar, a card room, a library, a conference center, a fitness facility, and 14 guest rooms.

Duration: 01:44
PROJECT

The Battery: Inside & Out

BCCI Construction completed a major renovation of a former factory, transforming it into a private social club. The existing three-story unreinforced masonry structure required a mandatory seismic upgrade and also included restoration work, an expansion of the basement level, and the addition of a fourth floor penthouse. BCCI reused materials throughout the building, such as columns, beams, and joists, applying every construction method available to deliver a project unlike any other in the heart of San Francisco’s North Beach neighborhood.

Duration: 2:31 mins
QUALITY

Pre To Post QC

Having a dedicated Quality Control team focused solely on workmanship details ensures that we will deliver your project on time with the highest level of quality and professionalism in the industry. Our unique, encompassing QC system maintains consistency in quality, provides measurable results, and produces a repeatable process from project to project.

Duration: 2:22 mins

You will be linking to another website not owned or operated by BCCI. BCCI is not responsible for the availability or content of this website and does not represent either the linked website or you, should you enter into a transaction. The inclusion of any hyperlink does not imply any endorsement, investigation, verification, or monitoring by BCCI of any information in any hyperlinked site. We encourage you to review their privacy and security policies which may differ from BCCI.

If you “Proceed”, the link will open in a new window.