![](https://bcciconst.com/wp-content/uploads/sites/5/2009/05/Pier40-1.jpg)
The San Francisco Redevelopment Agency hired BCCI Construction for the revitalization of this 100-year old historic structure located along the South Beach harbor of San Francisco. The scope of work included specialized underwater marine engineering to repair the underdeck, beautification of the west and south wall façades of the Pier 40 shed, and structural repairs to the north and east sides of the building. The south side features a city-mandated perimeter public access walkway with embedded remnants of an original cable car track-rail in the deck. Additional improvements to the structure include new ipe wood doors, an ornamental entrance gate, paved walkways, and new tenant signage.
![](https://bcciconst.com/wp-content/uploads/sites/5/2021/08/Pier-40-2_context.jpg)
![](https://bcciconst.com/wp-content/uploads/sites/5/2009/05/Pier40-1.jpg)
![](https://bcciconst.com/wp-content/uploads/sites/5/2021/08/Pier-40-4_entrance.jpg)
![](https://bcciconst.com/wp-content/uploads/sites/5/2021/08/Pier-40-1_detail-signage.jpg)
![](https://bcciconst.com/wp-content/uploads/sites/5/2021/08/Pier-40-2_context.jpg)
![](https://bcciconst.com/wp-content/uploads/sites/5/2009/05/Pier40-1.jpg)
![](https://bcciconst.com/wp-content/uploads/sites/5/2021/08/Pier-40-4_entrance.jpg)
![](https://bcciconst.com/wp-content/uploads/sites/5/2021/08/Pier-40-1_detail-signage.jpg)