« Previous Page

ADOBE – HOOPER

San Francisco, CA

Having built out nearly 500,000 square feet of office space at Adobe’s headquarters in San Jose and another 30,000 square feet for a commercial kitchen and fitness center in San Francisco, Adobe chose to partner with BCCI on the fit-out of its newest office location in San Francisco’s Design District.

The eight-month build included two lobbies, four floors of workspace, a café, and a roof deck. The new workplace features a fitness center fitted with meditation areas as well as showers; media rooms for music, games, and virtual reality modules; a library; a kitchen and café with a living wall feature; and medium and large conference rooms distributed throughout the open floor plan.

In addition to construction, BCCI’s Sustainability team advised on the project, which is pursuing two sustainability certifications – LEED-CI v4 and Fitwel. Both certifications support green building best practices and optimize employee health and well-being.

Architect: Gensler
Project Size: 251,500 sf
Date Completed: October 2018
LEED Certification: LEED-CI v4 Gold (Pending)
Fitwel Certification:  Fitwel 2 Star Rating (Pending)