Vornado Realty Trust selected BCCI to complete a refresh of an existing auditorium in this premier San Francisco office tower. The upgrades included new mechanical, lighting, and A/V systems. Our team ensured that features that were to remain, such as existing seating, were protected throughout the duration of the project. Collaboration with the architectural team, allowed us to navigate design changes during construction seamlessly. There was meticulous attention to every detail, which resulted in a flawless project delivery and a zero punch list.