Skip to main content
Back to Top

Verizon Media

Phased refresh and rebrand of three campus office buildings

LocationSunnyvale, CA

Client/Owner Verizon Media

Architect

  • Gensler

Size 440,000 sf

BCCI Construction was hired for the phased refresh and rebrand of three existing mid-rise office buildings at Verizon Media’s Sunnyvale campus. The project scope included interior demolition in all three buildings, open office upgrades, a new 2,400 square foot wellness center, a cafeteria expansion, and new R&D electrical labs.During construction, existing spaces on the ground floor of each building remained occupied. The project was significantly value-engineered to ensure that the client’s budgetary goals were met. Cost-effective material options were proposed to maintain the design intent, and BCCI’s project team worked closely with Gensler as design elements were refined concurrently with construction. The collaborative team approach ensured the project was completed on schedule, and the client’s first day of business dates were met for each phase.

Related Information

You will be linking to another website not owned or operated by BCCI. BCCI is not responsible for the availability or content of this website and does not represent either the linked website or you, should you enter into a transaction. The inclusion of any hyperlink does not imply any endorsement, investigation, verification, or monitoring by BCCI of any information in any hyperlinked site. We encourage you to review their privacy and security policies which may differ from BCCI.

If you “Proceed”, the link will open in a new window.