303 Bryant

Renovations to reposition a three-story office building, including improvements to a two-level below-grade parking garage

LocationMountain View, CA

Client/Owner JPMorgan Chase

Architect

  • HGA

Engineer

  • Tipping Structural Engineers
  • Interface Engineering

Size 56,000 sf

LEED Rating Leed Rating

BCCI was selected as the general contractor for the repositioning of a three-story office building, including a two-level below-grade parking garage, to enhance the asset’s appeal and marketability for leasing.

The interior renovations featured a redesigned main entry lobby, a new tenant lounge and meeting area, turnkey speculative office suites, and upgraded finishes and fixtures in the core restrooms. The building systems were upgraded throughout, including mechanical, electrical, and plumbing infrastructure, as well as new rooftop mechanical equipment. The existing elevator was also fully modernized.

Exterior improvements included a complete refresh of the façade and storefront system, new exterior paint, and upgraded lighting to elevate the building’s curb appeal and street presence. In the parking garage, all spaces were re-striped, walls and ceilings were painted, lighting was improved, and electric vehicle charging stations were installed.

The project was delivered to a high standard and achieved LEED Silver certification, demonstrating a strong commitment to sustainability and high-performance design.

You will be linking to another website not owned or operated by BCCI. BCCI is not responsible for the availability or content of this website and does not represent either the linked website or you, should you enter into a transaction. The inclusion of any hyperlink does not imply any endorsement, investigation, verification, or monitoring by BCCI of any information in any hyperlinked site. We encourage you to review their privacy and security policies which may differ from BCCI.