« Previous Page

444 CASTRO

Mountain View, CA

Working together with The Swig Company, BCCI is near completion on the transformation of this Class A high-rise office building in downtown Mountain View. The repositioning project includes heavy structural reinforcement throughout podium level and roof; complete abatement throughout all podium suites and common areas; and design-build base building upgrades of the mechanical, fire and life safety systems. Interior renovations comprise a refreshed main entrance lobby, ADA elevator cab upgrades, a new interconnecting staircase, new lounge and meeting areas, a shared conference space, restroom upgrades, and a new fitness center with shower and locker rooms. Exterior and site improvements include curtain wall and facade updates of 1st and 2nd floor podium buildings; a remodel of the existing courtyard with complete replacement of waterproofing and draining, new flooring, a new outdoor fire pit, casual seating, lighting and landscaping; new pedestrian walkways; and ADA modifications to city sidewalks and three building entrances. Additionally, new EV chargers have been installed in the garage. The renovations which maintain the building’s LEED Gold certification and Energy Star rating, are being completed while the property remains occupied.

Architect: AP+I Design
Project Size: 103,120 sf
Date Completed: October 2018